As of May 26, Cyclone Lookout is accessible and the trail (T40) is in good shape. We sawed out 8-10 blowdowns, removed an equal number without tools and dealt with a several other annoyances, including some alder encroachment. We were using hand tools, so left in-place a couple of trees in the 8-12 inch range, although we trimmed them out to make them easy step-overs. Both are in the lower half of the trail, about a half-mile apart. We’ll likely come back by the weekend and take them out.